Business Model

Solar PPA (Power Purchase Agreement)

Nippon Energy introduced the Solar Power Purchase Agreement (PPA) through distributed solar solutions in 2014. This model is also known as the “RESCO” model. Currently, Nippon Energy also has a network of private offsite renewable energy farms across the globe, through which we supply large corporates with clean energy as per their requirements.

Nippon Energy PPA model

Nippon Energy funds and installs a rooftop or ground-mount solar power plant on your facilities and all solutions are customised as per the requirements of the customers and include carports and superstructures.

Solar Power Solution Provider

How does the model work?

Nippon Energy provides Upfront investments and sets up the plant

Nippon Energy signs a PPA with
customers

Nippon Energy does the designing, procurement, construction, installation and commissioning of the plant on the premises of the customer

Capital Investment

Electricity Sale

Customer

Power Purchase Agreement

Payment per kWh as per
tariff plan

Nippon Energy

Rooftop or Ground mounted PV plant

The customer only pays per kWh
electricity

The customer enjoys Guaranteed Savings through a reduction in electricity bills as Nippon tariffs are always lower than that of the grid

Nippon Energy provides hassle-free maintenance to the plant through real-time analytics and remote monitoring system

Capax (EPC model)

The entire investment in this model comes from the power consumer. Nippon Energy provides turnkey installation of the entire solar power system and also hands over assets to the consumers. EPC also does annual operation and maintenance (O & M) of the plant on mutually agreed cost per annum. It also provides payback within 3-4years along with client benefits from Solar up to 35 years, with no bills.

Nippon provides installations of the solar PV systems on the roofs of IT/business parks and office complexes, shopping complexes, godowns, cold storage, hospital and health centres on the EPC mode or Investment mode, depending on the willingness of the owner of the premises.

In the CEPX model all investments are done by consumers while in the OPEX model, investments are made by a third party. Consumers are required to sign a PPA with mutually agreed tariff and tenure.

How does the EPC Model work?

In-House Design Capabilities (Engineering)

  • PV Plant Layout
  • Energy Modeling and Analysis
  • Structural Design for Foundations
  • AC and DC Arc Flash Calculations
  • Load Flow and Reactive Power Studies
  • Module String Calculation
  • PV Source Output Ampacity Calculations
  • DC Voltage Drop
  • DC and AC Cable Ampacity Using Neher-McGrath
  • Inverter Sizing
  • Inverter Step Up Transformer String
  • Medium Voltage Collection System Design
  • Substation Main Power Transformer Sizing
  • Substation Layout Design
  • Transmission Line (Generation Tie Line) Routing
  • Constructibility Reviews

Procurement

Nippon Energy has all kinds of procurement disciplines in-house and extensive relations with the industry’s leading suppliers. This ensures access to materials from a variety of sources at mutually agreeable commercial terms and minimal supply risk. Our Procurement Team works meticulously and closely with our engineering team, ensuring to provide competitively priced products that could comply with the project design solutions.

Construction

Nippon Energy has in-house construction disciplines and owns the latest generations of construction types of equipment. The Construction staff works closely with the Project Management and Engineering teams to ensure complete and unfettered compliance with all project permits and technicalities. Nippon Energy being a self-perform constructor brings an execution strategy for each project that minimizes risk and maximizes safety, quality and schedule control.

Operations and Maintenance

Our maintenance and solar management credentials include:

  • 24/7 continuous monitoring, ensuring optimal performance and achievement of financial projects
  • Cloud-based solar enterprise resource planning (ERP) integrated software suite proven on solar PV plants worldwide
  • Extensive reporting capabilities to address all the stakeholders informational requirements
  • Operations, Maintenance and Solar Asset Services

Contact Details


Head Office:

Nippon Energy Group G.K.

Marunouchi Trust Tower 20F
1-8-3 Marunouchi Chiyoda-ward Tokyo
100-0005 Japan 

TEL 03-5288-5175

Email address: [email protected]

 

Dubai Office:

Office No M15- M16 New Al Safiya Building Salahuddin Road Near Abu Hail Metro, Dubai, UAE

Phone number: +971 42 550995

Email address: [email protected]

 

KSA Office

Airport Road, Qurtubah, Riyadh 13244,Saudi Arabia
Email address: [email protected]

 Phone +966114007224

 

Europe Office

Ib vogt GmbH Helmholtzstr. 2-9  10587 Berlin Germany 

 +49 30 397445-0 ( [email protected] )

 

Pakistan Lahore Office:

1st Floor 755, Block C Faisal Town, Lahore, Punjab, Pakistan

Phone number: +92 423 5177777 : +92 423 5195888

Email address: [email protected]

 

Pakistan Karachi Office:

1408, 15th floor BRR tower I.I Chundrigar road Karachi

Email address: [email protected]

Enquire Now

We take great pride in everything that we do, control over products allows us to ensure our customers receive the best quality service.

  Refresh